
T400 Controller Facilities Manual
667/EB/20200/000 Page 4-3 Issue 9
4.4 OPERATION DURING CERTAIN MODES
4.4.1 Manual, Fixed Time and Start Up Mode
During Manual and Fixed Time Mode demands and extensions are disregarded. This
does not apply when Fixed Time to Current Maxes is the operative mode, see section
9.11.2.
However, demands are inserted for all non-running real phases when these modes
terminate. Pedestrian phase WAIT indicators will be illuminated while a demand is
present.
4.4.2 UTC
For UTC it is possible to configure the following:
1. Which phases and/or stages have latched or unlatched demands inserted
when a certain UTC demand bit is applied.
2. Which phases are extended by which UTC demand bits.
3. Demand dependent force bits and for each force bit which demands are
to be considered.
4.4.3 Mode
Extensions are disregarded during CLF mode. However, it is possible to configure
demand dependant moves to stages during CLF. This is achieved by selecting the
group influence as a demand dependant move to a stage and specifying the stage.
Two alternative movements can also be specified by selecting the ‘Add demand
dependant move’ group influence.
4.4.4 Disabling Modes
There is a table in the specification sheets for disabling modes on a per stream basis. If
this is filled in, the modes specified will be deleted permanently as it will be configured
into the controller. However, if modes are to be disabled under certain conditions, the
same parameters are available to special conditioning and thus special conditioning
may be used to delete modes.
Komentarze do niniejszej Instrukcji