Siemens EF 83P Series Instrukcja Obsługi Strona 1

Przeglądaj online lub pobierz Instrukcja Obsługi dla Płyty grzewcze Siemens EF 83P Series. Siemens EF 83P Series Instruction manual Instrukcja obsługi

  • Pobierz
  • Dodaj do moich podręczników
  • Drukuj
  • Strona
    / 113
  • Spis treści
  • BOOKMARKI
  • Oceniono. / 5. Na podstawie oceny klientów

Podsumowanie treści

Strona 1 - SIEMENS 802D-SL

T-7M SIEMENS 802D-SL VER:IM-T074300 NO:P20ABET7MS

Strona 2

Contents 1. Safety Regulation 1.1 Check Points for Safe Operation………………………………………….. 1-1 1.2 Safety Rules for this machine. 1-2 1.2.1 Safe

Strona 3 - PREFACE

Contents 8. Setting & Adjustment 8.1 Level Adjustment….……………………..………………………………... 8-1 8.2 Hydraulic Pressure setting & Adjustment………

Strona 4

8-1 8. Setting and Adjustment Periodical adjusting items Maintenance Description Period Method Note Ball screw (Pitch error) 1,000 hours Compensa

Strona 5 - CHANGES AND COPYING

8-2 8.2 Hydraulic Pressure Setting & Adjustment Hydraulic pressure adjustment: 1) Turn on the machine power.(Rotating“∣”position) 2) Loosen the

Strona 6 - Table of Contents

8-3 8.3 Lubricator Setting & Adjustment (1) Turn the botton from the range 0~60 mins. (2) Original setting of lube is 6c.c/15mins. (3

Strona 7

8-4 8.4 Tailstock Sensor Adjustment 1) Move tailstock to the proper distance from workpiece end, then lock the tailstock tightly. 2) Press the “out”

Strona 9

Contents 9. Maintenance 9.1 Maintenance of the Limit Switch on X Axis………………….………...… 9-1 9.2 Maintenance of the Limit Switch on Z Axis……………

Strona 10 - Contents

9-1 9. Maintenance 9.1 Maintenance of the Limit Switch on X Axis 9.1.1 Select the MPG mode and X axis which on the control panel. 9.1.2 Adjust t

Strona 11 - 1. Safety Regulation

9-2 9.2 Maintenance of the Limit Switch on Z Axis 9.2.1 Select the MPG mode and Z axis which on the control panel. 9.2.2 Adjust the Z axis home p

Strona 12

9-3 9.3 Maintenance of the Tool Setter Arm Sensor: 【Please refer to RENISHAW Manual.】

Strona 13 - without condensation

1-1 1. Safety Regulation. 1.1 Check Points for Safe Operation When using your CNC lathe, always make sure the following conditions or op

Strona 14 - 10% of nominal supply

9-4 9.4 Maintenance of the Safety Switch on the Chip Guard (CE Machine Only) 9.4.1 Assemble the safety switch on the fixed chip guard and clos

Strona 15

9-5 9.5 Adjustment of Tension the Spindle Drive Belt Note: Model of the belt: 5VX-1320 Adjustment is made in the following manner: 9.5.1 Loose

Strona 16

9-6 9.6 Replacement Procedures of the Safety Glass 9.6.1 First remove the chip door out of the machine and clean the broken glass. 9.6.2 Before p

Strona 18

1-2 1.2 Safety Rules for this machine 1.2.1 Safety Practices Each machine is shipped with a variety of built-in safety devices. To prevent such

Strona 19

1-3 1.2.2 Machine Installation Precautions Installation Site: (1) Allow space for maintenance. Inst

Strona 20

1-4 Allowable values: *Voltage…………………….…10% of nominal supply voltage. *Frequency……………………50/60

Strona 21

1-5 Air Supply: (1) Use only clean and dry air. (2) Make sure that the air source can supply the specified volume of air. Installation: (1) To hois

Strona 22

1-6 Before turning On The Power After Installation: After completing machine installation, check the following points before turning ON the power

Strona 23

1-7 1.2.3 Turning the Power On and Off (1) Always check that there are no obstacles or people near the machine's movable parts before

Strona 24

1-8 setup must be performed with the power ON, set the switches on the operation panel to the following positions: 1) Mode Selector Switch...

Strona 25 - WARNING

1-9 serious injury. (15) Make sure that machine's left door is well closed, or do not turn the spindle. (16) Do not insert bar stock into the spi

Strona 26 -  People who ignore

LEADWELL T-7M(802D-SL) INSTRUCTION MANUAL P20ABET7MS

Strona 27 - 1.4 Safety Device Location

1-10 (28) Clamp the workpiece and cutting tools securely. Depth of cut and cutting feed must be selected with small valued. (29) During center pressin

Strona 28 - WARNING

1-11 1.2.5 Safety Practices during Maintenance and Inspection Always turn OFF the power before performing maintenance and inspection. Maintenance and

Strona 29

1-12 7) Disassemble and clean the chuck periodically. Apply grease to the chuck every day. 8) The solenoid valves become very hot when the machine i

Strona 30

1-13 be supported by the tailstock. (2) When chucking a workpiece, determine the chucking method and chuck pressure considering the rigidity of the wo

Strona 31

1-14 effects (smell, poisoning, etc.) on human beings. (2) The coolant must not deteriorate during storage. (3) The coolant must not cause corrosion o

Strona 32

1-15 1.3 Machine Potential Danger Explanation 1.3.1 Machine Potential Danger Zone During machine automatically cutting, inside of the machine is a

Strona 33

1-16 1.3.2 High Voltage Danger Zone Except electric cabinet, those stickers with mark of also with high-voltage power, please do not open it

Strona 34

1-17 1.4 Safety Device Location There are many safety device on this machine in order to protect operators from injury or machine damage. However t

Strona 35

1-18 1) It is not allowed to remove or change the safety devices without the our permission. 2) Only qualified electric engineer is allowed to o

Strona 36 - Airborne noise test report

1-19 1.5 Caution Label On the Machine

Strona 37 - 2.2.2 Nomenclature

I PREFACE Thank you for purchasing the CNC MACHINE TURNING CENTER. We at Leadwell are confident your purchase will greatly expand your work capa

Strona 40 - 2.3 Working Range

Machine Brief Introduction

Strona 41 - 2.3.2 Tool Travel

Contents 2. Machine Brief Introduction 2.1 Machine Introduction & Noise Level……………………………………... 2-1 2.1.1 Machine Introduction……………………………………

Strona 42 - 2.3.3 Clamping Range

2-1 2.1 Machine Introduction & Noise Level 2.1.1 Machine Introduction: The CNC Lathe has been developed by Leadwell CNC machine company’s

Strona 43

2-2 The CNC Lathe is a kind of machine with servo controller, and it can automatically work after all things are ready for working; it doesn’

Strona 44 - O.P.T S.T.D

2-3 2.1.2 Noise Level The method to test the noise level is to measure the noise by a distance of 1 meter from machine guarding and height 1.6

Strona 45

2-4 2.2 Machine Outline Dimension & Nomenclature 2.2.1 Machine Outline Dimension 2.2.2 Nomenclature

Strona 47

2-6 2.2.3 Sensor/Limit switch Location: No. Description No. Description 1 Tailstock detect sensor 2 Tool arm detect sensor 3 Front door sensor

Strona 48

II BRIEF INTRODUCTION OF LEADWELL Founded in 1980, Leadwell CNC Machines Mfg., Corp., is now the most professional CNC machine tool maker in Tai

Strona 49

2-7 2.3 Working Range 2.3.1 Tool Capacity T-7M If the O.D. tool shank is □25mm(1”)*150mm(6”) long, then the maximum turning diameter is∮285mm(11.

Strona 50

2-8 2.3.2 Tool Travel Maybe the boring bar tool extends 70mm over the turret, when you use boring bar tool, Z axis travel should reduce about 70mm

Strona 51

2-9 2.3.3 Clamping Range The chuck specification is Ton Fou TF3B-8A6 model as below. *If the end user wants to change type of hydraulic chuck, end

Strona 52

2-10 2.3.4 Spindle Nose End & Tailstock Taper Dimension (1) Spindle Nose Ens. The spindle nose specification comply to ISO 702/1 (8) standard.

Strona 53 - 2.5 Tooling Diagram

2-11 2.4 Machine Specification 2.4.1 Machine Hardware Specification 項 目 / SPECIFICATIONS 規 格 加工範圍 Capacity O.P.T S.T.D .最大旋徑 Ma

Strona 54

2-12 項 目 / SPECIFICATIONS 規 格 .副主軸最大扭力 Max. sub spindle torque Kg-m--- .副主軸快速位移 Sub spindle rapid traverse mm/min--- .副主軸伺服馬達

Strona 55

2-13 項 目 / SPECIFICATIONS 規 格 .Z 軸馬達 Z axis motor Siemens /KW(HP)1FK7083-5/3.3(4.42) .Z 軸馬達扭力 Z axis motor rated torqu

Strona 56 - 3.1 Foundation Requirement

2-14 規 格 項 目 / SPECIFICATIONS .油泵性能 Pump capacity 1./min65 .油泵壓力 Pump pressure kg/c㎡2 .油箱容量 Tank capacity

Strona 57 - ~40

2-15 2.4.2 Machine Software Specification 項 目 / SPECIFICATIONS 規 格 機型特殊選擇性附件 / Special Option 公制刀盤 Metric disc ●

Strona 58 - LTC-300

2-16 項 目 / SPECIFICATIONS 規 格 機型標準附件 / Standard 夾頭 Chuck 1 set L02AA00141 夾頭油壓缸 Chuck cylinder 1 set L02ABTFRC8 軟

Strona 59 - of nominal voltage

III CHANGES AND COPYING Leadwell reserves the right to make any change or modification to this manual without giving previous notice and without

Strona 60 - OIL USAGE RECOMMENDATION

2-17 項 目 / SPECIFICATIONS 規 格 機型選擇性附件 / Option 切削輸送機 Chip conveyor No. 4010019020 --- 蓄屑推車 Bucket No. 4020008000 ---

Strona 61

2-18 2.4.3 Spindle Motor Torque Curve *Note: Customer can specify the spindle motor specification with same horsepower.

Strona 62

2-19 2.4.4 Turret Motor Torque Curve *Note: Customer can specify the spindle motor specification with same horsepower. 1FT6086-3000rpm/ON M

Strona 63

2-20 2.5 Tooling Diagram *Note: Please contact with Leadwell for request of tool holders and sleevs.

Strona 64

Preparation Before Machine Setup

Strona 65

Contents 3. Preparation before Machine setup 3.1 Foundation Requirement…………………………………………………... 3-1 3.2 Surrounding Requirement……………………………………

Strona 66 - Unpacking machine

3-1 3. Preparation before Machine setup The place and transportation passage should be cleaned completely before machine installed, and firm the foun

Strona 67

3-2 3.2 Surrounding Requirement Please keep pleasant working environment according to advice as follows. (1) Don't expose machine and NC under

Strona 68

3-3 (5) Please notice the fatness of the ground will affect machine accuracy. (6) Avoid air dust or dropped liquid to gather on machine. LT

Strona 69 - CAUTION

3-4 3.3 Power Source Requirement 3.3.1 Power Specification  T-7M                        

Strona 70 - 4.5 Relocating of Machine

Table of Contents 1. Safety Regulation 1.1 Check Points for Safe Operation………………………………………….. 1-1 1.2 Safety Rules for this machine. 1-2 1.

Strona 71

3-5 Duration: less than 1.5 msec. 5) Allowable waveform distortion of AC voltage: less than 7 6) Allowable imbalance of line voltag

Strona 72

3-6 3.3.3 Air SpecificationOption (1) The air flow capacity depend on frequency of auto door function and spindle air blast. Leadwell recommend to

Strona 74 - 5.2 Power on Machine

Contents 4. Transportation 4.1 Requirement of equipment….……………………………………………... 4-1 4.2 Marking on Wooden Case………………………………………………… 4-2 4.3

Strona 75

4-1 4. Transportation 4.1 Requirement of equipment 1) Only an authorized forklift driver can drive the lift. 2) The forklift capacity should

Strona 76 - ON OFFbutton functions

4-2 4.2 Marking on Wooden Case The meaning of its mark is as following: Easy broken goods Prevent from water Hanging position This si

Strona 77 - 10~20kgf/cm

4-3 4.3 Unpacking machine This machine is packed by rust protective bag or aluminum foil and either packed both wooden case or none wooden case. If

Strona 78 - 5.3 Leveling Adjustment

4-4 4.4 Moving Machine after Unpacking 4.4.1 Confirming fixed Bracket on Machine Make sure that X axis fastening bracket, Z axis shipping fastening

Strona 79 - 5.4 Test-Cutting

4-5 4.4.2 Fork Lifting Machine When machine is on wooden case bottom, the length of the key in front of fork needs to use over the wooden case botto

Strona 80

4-6 2) Forks too short or too far from center of gravity will result in machine instability or possible fall. 3) When driving forklift, th

Strona 81 - 50mm*100mm long

3. Preparation before Machine setup 3.1 Foundation Requirement…………………………………………………... 3-1 3.2 Surrounding Requirement…………………………………………………. 3-2

Strona 82

4-7 4.5 Relocating of Machine (1) X, Z axes home return. (2) disassemble the rear cover of machine.

Strona 83

Installation

Strona 84

Contents 5. Installation 5.1 Machine Installation….……………………..……………………………... 5-1 5.2 Power On Machine…………………………...…………………………… 5-2 5.2.1 Cab

Strona 85

5-1 5. Installation 5.1 Machine Installation 1) Clean up the space necessary for machine installation. 2) Make sure once again that the space

Strona 86 - Daily Inspection List

5-2 5.2 Power on Machine 5.2.1 Cable Connection 1) Make sure theEMERGENCY STOPswitch is in OFF position.. 2) Connect cable to the main power te

Strona 87

5-3 5.2.2 Inspection before Power On: (1) Make sure that the machine's power source is according to machine requirement. (2) Make sure power c

Strona 88

5-4 5.2.3 Inspection after Power on: Before executing this item, please read “operation manual” to understand all buttons' function and operati

Strona 89

5-5 8) Machine and the space around the machine cannot have oil. 9) Check if all of the rotating components function normally 10) Check if hydraul

Strona 90

5-6 5.3 Leveling Adjustment The machine must be adjusted level and accuracy very carefully, because the first installation has a huge influence to t

Strona 91 - 7.3.1 Check list

5-7 5.4 Test-Cutting 5.4.1 Checklist before test-cutting 1) Make sure that the tool holder is well locked 2) If the tool is well locked on the to

Strona 92

8. Setting & Adjustment 8.1 Level Adjustment….……………………..………………………………... 8-1 8.2 Hydraulic Pressure setting & Adjustment…………………….……………

Strona 93 - CAUTION

5-8 5.4.2 Warming up machine To make sure the precision of cutting and workpiece, warming up machine sufficiently is definitely necessary. The follo

Strona 94 - 9) Dry it up with air gun

5-9 5.4.3 Test-Cutting 1) We suggest to take a workpiece of50mm*100mm long medium carbon steel (S45C) for test-cutting. 2) Select a R0.4 outer di

Strona 95

Operation Operation Instruction (Please refer to Operation Manual)

Strona 97 - 7.3.4 Cleaning Coolant Tank

Contents 7. Maintenance & Cleaning 7.1 Daily Maintenance Procedures.…………...……………………………... 7-1 7.1.1 Daily Inspection after Operation………………

Strona 98

7-1 7. Maintenance & Cleaning 7.1 Daily Maintenance Procedures (1) Follow the sticker "Lathe Daily Maintenance Checklist" on the mach

Strona 99

7-2 (2) The daily maintenance can be executed by referring formats as per following chart. Daily Inspection List Item Check list / Date 1 2

Strona 100

7-3 (3) Lubrication oil tank: Please keep the oil in the lubrication oil tank above the middle level line, and check if there is dirt at the bottom o

Strona 101 - 8.1 Level Adjustment

7-4 7.1.1 Daily Inspection after Operation (1) Chips must be clean after daily work. c. Inside the machine. d. Chip conveyor (option)

Strona 102

7-5  *Notice the following items when cleaning: 1) The poster stand must be put on the top of operation panel box when cleaning chips on the r

Strona 103

Safety Regulation

Strona 104 - Indicated lamp

7-6 7.2 Monthly Machine Procedures To realize monthly maintenance, to make a check list as following and check one by one. Monthly Maintenance reco

Strona 105

7-7 7.3 Periodic Maintenance Procedures 7.3.1 Check list Maintenance description Period Method Note Vibration & Noise of Ball screw 1,000

Strona 106

7-8 7.3.2 Cleaning Lubricator Tank 1) Turn the power off first. (Rotating“ 0 ”position) 2) Open the top cover. 3) Clean the tank with diese

Strona 107

7-9 4) Take off the filter net on the outlet. 5) Clean it up in diesel oil tank. 6) Dry it up with air gun. Take care with use of compre

Strona 108

7-10 8) Clean it up in diesel oil tank. 9) Dry it up with air gun. 10) Mount the filter net back to the original position.

Strona 109

7-11 11) Fasten the tank top cover. 12) Fill the clean lubrication oil into the oil tank till above middle line. 13) Turn the power on.

Strona 110

7-12 7.3.3 Cleaning Hydraulic Tank 1) Turn off the power. (Rotating “ 0 ” position) 2) Screw off the plug on the bottom of oil tank to drain o

Strona 111

7-13 7.3.4 Cleaning Coolant Tank 1) Drain out all the coolant in the tank and clean up the mud and chips. 2) Add the coolant into the clean cool

Strona 112

7-14 7.3.5 Cleaning Air Filter Regulator<OPTION> 1) Screw open the oil cup of air filter regulator and add some suitable amount of oil to have effe

Strona 113 -

Setting & Adjustment

Komentarze do niniejszej Instrukcji

Brak uwag